Home Services Projects Team Affiliates Contact
828 Coney Drive · Belize City · +501-223-2072

Caye Caulker Wastewater Project

YEC joined Project Planning Management Limited and Water Specialist Guillermo Madariaga in performing studies, data collection and full design for a new wastewater collection and treatment system for Caye Caulker Village, on the island of Caye Caulker off the coast of Belize. The system featured a state of the art vacuum-based wastewater collection network and a modular treatment system. The design also featured site grading, access and circulation roads, storage tanks and operations buildings.

Category Civil Engineering / Water & Wastewater
Location Caye Caulker Village, Caye Caulker, Belize
Role Civil engineering design
Partners Project Planning Management Limited · Guillermo Madariaga

Start a project

Have something like this in mind?

Tell us about it — we'll bring the engineering from concept to completion.

Contact Us

+501-223-2072 · info@yecbelize.com