Home Services Projects Team Affiliates Contact
828 Coney Drive · Belize City · +501-223-2072

Belize River Valley Water Project

YEC joined Roughton International of the U.K. and our affiliate Lucien Chung on a project that is transforming the lives of thousands of families in the Belize River Valley. The works comprise 45 miles of water mains and secondaries, three storage reservoirs and three pumping stations — complete with bridge crossings, metering zones and controls.

Category Water
Location Belize River Valley, Belize District
Role In association with Roughton International & Lucien Chung
Scope Water mains · Reservoirs · Pumping stations

Start a project

Have something like this in mind?

Tell us about it — we'll bring the engineering from concept to completion.

Contact Us

+501-223-2072 · info@yecbelize.com